Transparent Payment Schedule

A transparent schedule tied to construction milestones — pay only as the work progresses, with no surprise fees along the way.

The Process

How Payments Work

Lot and villa payments are handled separately, each tied to clear milestones. You only pay as progress is made — never for work that hasn’t been done — and the villa price is locked when you sign the construction contract. The schedules below show the three lot milestones and the four villa construction milestones in detail.

Every payment goes to Sienna's developer company account and is tied to a signed contract or completed construction work. Your $5,000 reservation deposit is refundable (less up to $100 in fees) if you cancel within the 30-day reservation period, before the Promise of Sale. See the full buyer-protection framework →

Lot Payment Phases

Four milestones from reservation to lot handover

Lot Payments

US$5,000
Reservation
Refundable deposit to secure your lot
50%
Promise of Sale (POS)
Including the US$5,000 reservation deposit
40%
Act of Sale
Due at signing of the Act of Sale
10%
Lot Reception
Final payment when the lot's road, power and water are connected
Construction Milestones

What You Get for Each Villa Payment

Every villa payment is tied to a real construction event. Here's what progresses on site as each milestone is reached.

Site preparation and foundations.

  • Land cleared and access roads created
  • Site installation, signage, and security in place
  • Temporary water and electricity connections
  • Septic tank construction
  • Bulk excavation and foundation footing excavation
  • Retaining walls

The structural shell takes shape.

  • Foundation footings completed
  • Load-bearing columns and beams
  • Ground floor slab and upper floor slab
  • Load-bearing walls
  • Steel structure at main level
  • Basement waterproofing and backfill

Your villa becomes a home.

  • Roof slab with complete waterproofing
  • Interior walls plastered, smoothed, and painted (walls, ceilings, woodwork)
  • Floor screeds and floor coverings
  • Wall ceramics and false ceilings
  • Doors and windows installed
  • Kitchen installation
  • Built-in joinery: wardrobes, dressing, shelving
  • Electrical and plumbing fixtures installed and all systems commissioned
  • Railings and guardrails

Handover.

  • Exterior landscaping
  • Light fixtures installed
  • Bathroom accessories installed
  • Full site cleaning
  • Furniture installation (if included in your package)
  • Walkthrough and formal reception of the villa

Months shown are indicative — payments are triggered by the completion of each deliverable, not by dates. Deliverables follow the approved villa plans; exact scope depends on the villa model and any buyer-requested changes.

Your Numbers

Run your own schedule

Pick a lot price and villa model to see exactly what each milestone payment will be.

Interactive Calculator

Build Your Payment Plan

Pick a lot, set your reservation and target villa delivery date (any time between 10 and 24 months after Lot Reception), and see exactly what you'll pay — and when.

Construction starts at lot reception (Jun 30, 2027) or up to 12 months later; build time is 10 months.

Zone: 1Villa model: C3Size: 1,143 sqmStatus: Available
Lot price
$120,015
Villa price
$477,050
Grand total
$597,065
Due at reservation
$5,000

Timeline

Each marker represents a milestone payment between your reservation and delivery dates.

← Swipe to see the full timeline →

Reservation
Nov 7, 2026
$5,000
Promise of Sale (POS)
Dec 7, 2026
$55,008
Act of Sale (AOS)
Mar 7, 2027
$48,006
Lot Reception
Mar 7, 2027
$12,001
Contract Signing
Mar 7, 2027
$190,820
Structural Works Begin
May 7, 2027
$143,115
Finishes Begin
Sep 7, 2027
$119,263
Physical Delivery
Jan 7, 2028
$23,852
Lot payments Villa payments

Payment Schedule

Reservation
Lot · Nov 7, 2026
$5,000
bal $5,000

Deposit — secures your lot

Promise of Sale (POS)
Lot · Dec 7, 2026
$55,008
bal $60,008

50% of lot price, minus the reservation deposit

Act of Sale (AOS)
Lot · Mar 7, 2027
$48,006
bal $108,014

40% of lot price — due at signing of the Act of Sale

Lot Reception
Lot · Mar 7, 2027
$12,001
bal $120,015

10% of lot price — final lot payment

Contract Signing
Villa · Mar 7, 2027
$190,820
bal $310,835

40% of villa price

Structural Works Begin
Villa · May 7, 2027
$143,115
bal $453,950

30% of villa price

Finishes Begin
Villa · Sep 7, 2027
$119,263
bal $573,213

25% of villa price

Physical Delivery
Villa · Jan 7, 2028
$23,852
bal $597,065

5% of villa price

Grand total$597,065

Lot dates follow legal deadlines (POS 30 days after reservation, AOS 3 months after POS, Lot Reception fixed at mid-2027). Villa payments are scheduled backwards from delivery across a 10-month construction window. Final milestone timing is agreed at contract signing and may vary based on construction progress.

The schedule starts at signing

A $5,000 refundable hold reserves your lot. Then the milestones above run on construction reality, not calendar dates.